Home › Branchen › Piping Construction
Piping Construction

Industrial Services for Piping Construction

In piping construction, prefabrication and assembly determine schedules, weld quality and cost. Pipe spools must be cut to length, cleanly bevelled and prepared for welding — on site as well as in prefabrication.

HSOS supports prefabrication and assembly with machined pipe cutting, precise beveling for all common weld preparations, controlled preheating and post-weld heat treatment (PWHT) on thin- and thick-walled joints. Spark-free cold cutting without heat input is possible even in hazardous or live-plant areas.

Documentation to AD 2000, ASME and project-specific codes — audit-ready and traceable.

Practical know-how for site and project managers

Reference pages for work on existing plants and international projects – compiled from our practical experience on site.

Project sequence
Piping installation sequence
Ten phases from pipe class to commissioning: what must be done beforehand, where HSOS comes in and what follows.
→
Pressure test
Preparing a pressure test properly
Checklist before, during and after the test, test pressure to EN 13480-5 and ASME B31.3, blinds and blind list.
→
Heat treatment
Stress relieving guide values
Holding temperature, thickness limit and holding time by material to EN 13480-4 and ASME B31.3, plus preheating and measurement.
→
Flanged joints
Flange distortion during welding
Why flange faces distort, how to prevent it and how they are made flat again on site.
→
Pipe cutting
Cold cutting instead of flame cutting
Pipe cutting without a heat-affected zone: when it pays off for creep-resistant and stainless steels.
→
Standards
Piping standards old and new
DIN 2448, DIN 2633, ND 16, St 35.8: old designations on as-built drawings and the EN, ISO and ASME standards that apply today.
→
Glossary
Piping glossary English–German
Around 230 technical terms and isometric abbreviations – from elbow and spectacle blind to BOP – with search and notes on typical mistranslations.
→
Weld preparation
Pipe bevel overview
Joint types to EN ISO 9692-1 and ASME B16.25, unequal wall thicknesses and bevels on branches.
→
Flanged joints
Flange facings and surface finish
Flange types to EN 1092-1, roughness by gasket type, and weld lip seals.
→
Bolting
Width across flats table
Widths across flats and thread pitches M6–M100 and ¼″–4″ – and what they mean for torque and bolt tensioning.
→

Challenges

  • ▸Accurate cutting and beveling for weld-ready joint preparation
  • ▸Tight schedules in prefabrication and site assembly
  • ▸Controlled preheating and PWHT across varying wall thicknesses
  • ▸Machining without sparks and heat input in live-plant areas
  • ▸Traceable documentation per weld and component

Our experience

  • ✓Machined pipe cutting and beveling from DN 25 to DN 3000
  • ✓Weld preparation (V, U, compound bevels) to WPS
  • ✓Controlled preheating with resistance and induction techniques
  • ✓Post-weld heat treatment (PWHT) to AD 2000 HP 7/1 and ASME PCC-2
  • ✓Spark-free cold cutting in Ex and live-plant zones

References

Pipe prefabrication DE
Cutting, beveling and weld preparation of spools
Result: On-schedule prefabrication, documented bevels
Site assembly EU
Preheating and PWHT on assembly welds
Result: Approved without rework
Chemical plant extension
Spark-free cold cutting during live operation
Result: No production loss

FAQ

Do you work in prefabrication and on site?

Yes — pipe cutting, beveling, preheating and PWHT both in prefabrication and during on-site assembly.

Which pipe sizes do you handle?

Machined cutting and beveling typically from DN 25 to DN 3000, larger diameters on request.

Can you cut without heat input?

Yes — spark-free cold cutting with no heat input, including Ex and live-plant areas.

Always available – fast on site

Less downtime, less production loss. Contact us – 24/7.